Application for a permit is made to the Director. Right-of-way permit applications shall contain and will be considered complete only upon compliance with the requirements of the following provisions:

(a) Registration with the Director pursuant to this chapter;

(b) Submission of a completed permit application form, including all required attachments, and scaled drawings showing the location and area of the proposed project and the location of all existing and proposed equipment;

(c) Payment of all money due to the City for:

(1) Permit fees and costs;

(2) Prior obstructions or excavations;

(3) Any loss, damage, or expense suffered by the City because of applicant’s prior excavations or obstructions of the rights-of-way or any emergency actions taken by the City.

(d) For efficiency, the Director may approve an alternate procedure for submission and notification of excavations; permit applications; permit application details; and payment of permit fees by a franchised utility whose operations require frequent excavations on a continuing basis. (Ord. 17587 § 5-5, 10-24-00. Code 1995 § 130-680.)