Skip to main content
Loading…
This section is included in your selections.

Any connection of any kind below finished grade either directly or indirectly to any public sanitary sewer for any building under construction shall be sealed with a blind plug, using accepted sealing methods, and such seal shall not be broken or removed until the area adjacent to the foundation of such building is backfilled and compacted in a proper manner to a height at the foundation wall of 10 inches above the natural ground level at a distance of 10 feet from the foundation wall. (Ord. 19496 § 56, 12-21-10; Ord. 16388 § 7.13, 11-5-91. Code 1995 § 146-284. Formerly 14.80.440.)