Skip to main content
Loading…
This section is included in your selections.

(a) It shall be the responsibility of the contractor through his designated master or his designated agent to make arrangements for field inspections at appropriate times for required inspections of permitted work; this includes a final inspection prior to occupancy.

(b) It shall be the responsibility of the contractor through his designated master or designated agent to promptly arrange for reinspection of any work which failed an inspection. All reinspections must be completed within 30 days of the original inspection failure. (Ord. 18533 § 3, 11-8-05. Code 1981 § 10-40.4. Code 1995 § 26-53.)