Appendix I is hereby amended by the addition of the following provisions for Installation Standards for Trenchless Insertion of Polyethylene (PE) Pipe for Sewer Laterals:

IAPMO IS 26-2006

1.0 Scope.

1.1 Scope.

This standard shall govern the Trenchless Installation of Polyethylene (PE) pipe for use in sanitary and storm sewers. The installed pipe shall comply with the requirements of the Uniform Plumbing Code (UPC) published by the International Association of Plumbing and Mechanical Officials (IAPMO) as to grade and connections to existing pipe and shall also comply with this standard.

Note: The following sections of the Uniform Plumbing Code apply:

103.5.6 Testing of Systems

103.5.7.2 Responsibility

103.5.8 Other Inspections

103.5.81 Defective Systems

103.6.1 Other Connection

218.0 Definition of PE

301.1 Minimum Standards

309.0 Workmanship

312.0 Protection of Piping and Materials and Structures

314.0 Trenching, Excavating and Backfill

Chapter 7 Sanitary Drainage

701.2 Drainage Fittings

705.11.3 Plastic Pipe to Other Materials

2.0 PRODUCT REQUIREMENTS

2.1 Minimum Standards

2.1.1 Materials. Materials shall comply with the following: The polyethylene pipe used is covered by the American Society for Testing (ASTM) standards listed later in this standard. [UPC 301.1]

Materials: HDPE Extra High Molecular Weight 3408 SDR 17 Pipe Socket-Type PE Fittings for Outside Diameter-Controlled Polyethylene Pipe.

Note: The HDPE 3408 SDR 17 pipe used in this process was selected because of its ability to retain its circular shape even when bent on a 4-foot radius during and after installation.

2.1.2 Table 1401.1 Standards.

ASTM D 2239

ASTM D 2447

ASTM D 2657

ASTM D 2683

ASTM D 3261

ASTM F 714

ASTM F 894

IAPMO PS 25

2.2 Protection of Pipe.

2.2.1 Storage and Handling. Pipe shall be stored in a way to protect it from mechanical damage (slitting, puncturing, etc.). It shall be stored under cover to keep it clean and avoid long term exposure to sunlight. Exposure to sunlight during normal construction periods is not harmful.

2.3 Types of Joints. PE joints shall be made as follows:

2.3.1 Molded Rubber Coupling Joints. Molded rubber coupling joints shall be installed in accordance with Appendix I of the UPC and with section 705.

2.3.2 Shielded Coupling Joints. Shielded coupling joints shall be installed in accordance with Appendix I of the UPC and with section 705.4.2.

2.3.4 Hubless Cast Iron Pipe Joints. Hubless cast iron pipe joints shall be installed in accordance with Appendix I of the UPC and with section 705.4.2.

2.3.5 Heat Fusion Joints. Heat fusion joints shall be made according to the manufacturer’s procedure, installation instructions, and either ASTM D 2659 or ASTM D 3261.

2.4 Trenchless Installation of sewers will be as follows:

I. Preliminary Steps. Inspect the inside of the sewer line using a television camera and video tape recorder to ascertain the line condition. Mark the details revealed by the video inspection including:

1. The ground surface to show the location of the lateral tie of the city wye.

2. The line location with an arrow in the street pointing back at the lateral.

3. The property denoting the lateral location.

4. The locations of the proposed excavations.

Obtain utility line identification service contact information and all applicable permits.

II. Excavation. In addition to the above markings, the local utility companies will mark utilities. Considerations are soil density; clearance from obstacles, utilities, and structures; location of bends; and water service locations. Excavations and shoring shall be in accordance with jurisdictional safety requirements.

III. Set Up. Fuse the proper length of polyethylene pipe in accordance with ASTM D 2657 and fuse the end to a small length that is attached to the pulling head. A rod pusher cable is pushed through the damaged host pipe and attached to the pulling cable, which is then drawn through the pipe. The clevis end of the cable is attached to the pulling head. The pulling equipment is then set up according to the manufacturer’s instructions.

IV. Pulling. Pull the pulling head through. Once the pull is done, complete the connection to the existing piping.

2.5 Cleanouts. Cleanouts shall be installed in accordance with UPC Section 707.0.

2.6 Inspections. The completed piping shall be internally inspected by television camera unless waived by the Administrative Authority. [UPC 103.5]

2.7 Testing. Completed piping shall be subjected to testing in accordance with Section 712.0 or 723.0 of the UPC.

(Ord. 20257 § 50, 8-18-20.)