Skip to main content
Loading…

Article III. Minimum Standards

This article is included in your selections.

Cross References:Public Works Department, TMC 2.20.100.

This section is included in your selections.

All grading operations shall proceed according to a work schedule included in the grading and erosion control plan. The schedule shall provide that the soil is exposed and unprotected for the shortest possible period of time. (Ord. 16432 § 6(1), 3-10-92. Code 1995 § 66-121.)