Skip to main content
Loading…
This section is included in your selections.

The subdivider shall connect with a public water main and make such connection accessible to each lot within the subdivision. Plans and contracts for such installation shall be submitted to and approved by the City before issuance of building permits and shall be paid for by the owner of the subdivision. (Code 1981 § 41-123. Code 1995 § 134-171.)