Skip to main content
Loading…
This section is included in your selections.

When required by the Development Coordination Office or Traffic Engineer, plans shall be submitted by the applicant which clearly set forth the location of materials to be stored, dimensions of materials to be stored, dimensions of area requested and types of pedestrian protection to be provided. (Code 1981 § 10-112. Code 1995 § 26-203.)

Cross References:Traffic Engineer, TMC 10.10.010.